01Project
02Site
03Building
04Assessment
05Specification
Step 01 — Project Information
About this tool

This tool is a practical reference guide for architects and building consultants. It does not replace a formal BAL assessment by a suitably qualified person (SQP) or Bushfire Attack Level report. Output should be verified against current state-specific requirements and the applicable planning scheme.

State / Territory
NCC Volume
Step 02 — Site Conditions
Vegetation Type (AS 3959:2018 Table 2.1)
Effective Slope Under Vegetation (AS 3959:2018 Clause 2.2.3)
Distance from Nearest Classified Vegetation (metres)
Bushfire Overlay / Zone
Step 03 — Building Details
Building Use / Classification
Proposed Construction Type
Proposed Work Type
Step 04 — BAL Assessment Result
Assessment Inputs
ParameterSelected Value
Step 05 — BAL Specification
Export:
Disclaimer: This specification has been generated as a reference guide only and is based on the inputs provided. It does not constitute a formal BAL assessment, Bushfire Management Statement, or construction certificate. All BAL determinations must be verified by a suitably qualified person (SQP) and comply with all applicable state legislation, planning scheme requirements, and current editions of AS 3959:2018, NCC 2022 (and amendments), and any relevant CFA/RFS guidelines. Plico Advisory accepts no liability for omissions or errors arising from the use of this tool.
Export: